Building Information Modelling (BIM)

Since 2013, BHCC has implemented using BIM for clash detection, quantity take-off, site utilization and tower crane planning, precast planning and visualization, technical coordination and shop drawing production. With BIM, communication and coordination process between consultant, main contractor and sub-contractor has never been this easier. Using BIM technology, we are able to achieve higher and higher productivity with the elimination of redundant and abortive works.

BIM1.png
BIM3.png
BIM5.png
BIM7.png
BIM9.png

1.VISUALIZATION

2.CLASH DETECTION

3.CRANE PLANNING

4.SITE PLANNING

5.SHOP DRAWING

6.DETAILING FOR ANALYSIS

7.4D SCHEDULE

8.QUANTITY TAKEOFF FOR COST ESTIMATE (5D COSTING)

9.FM (6D)

10.VISUALIZATION &VIRTUAL REALITY

BIM2.png
BIM4.png
BIM6.jpg
BIM8.png
BIM10.png

BIM IMPLEMENTATION